GRD-01
GRD-02
GRD-03
GRD-04
GRD-05
GRD-06
GRD-07
GRD-08
GRD-09
GRD-10
GRD-11
GRD-12
GRID
An Economical Choice.
GRD-01
Sand Base
GRD-02
Soft Plaster
GRD-03
Forest Core
GRD-04
Brick Tone
GRD-05
Deep Navy
GRD-06
Steel Blue
GRD-07
Pale Concrete
GRD-08
Carbon Base
GRD-09
Clay Rust
GRD-10
Slate Form
GRD-11
True Blue
GRD-12
Lime Edge
| Description | Grid |
| Type of Floor Covering | Vinyl Floor Covering |
| Size | 2mtr*20mtr (40 m2) |
| Total Thickness | 2 mm |
| Wear Layer | 2 |
| Surface Treatment | PUR |
| Total Weight | 3400 gsm |
| Installation System | As per Standard |
| Classification | Class 34 : Very Heavy Commercial Class 43: Heavy Light Industrial |
Tips for Maintenance
1. Controlling Soil with Entrance Mats:
- Utilizing appropriate flooring mats at building entrances, both outside and inside, effectively contains soil from entering high-traffic areas.
- Mats strategically placed in other high-traffic zones further aid in reducing soil transfer.
2. Vacuuming for Soil and Dust Removal:
- Vacuuming is the cornerstone of any maintenance program focused on removing surface soil and dust.
- Regular vacuuming helps prevent soil buildup and maintains cleanliness.
3. Swift Spill Cleanup to Prevent Stains:
- Immediate cleanup of spills is essential to minimize the risk of permanent stains.
- Prompt action reduces the impact of spills on flooring and surfaces.
4. Interim Cleaning for Prolonged Cleanliness:
- Various methods of interim cleaning can be employed to extend the intervals between more intensive cleaning sessions.
- Scheduled interim cleaning contributes to maintaining cleanliness and appearance.
5. Restorative Cleaning Methods:
- Deep cleaning methods like hot water extraction and encapsulation effectively remove embedded soils.
- Restorative cleaning revitalizes surfaces and restores them to a cleaner state.
Request A Call Now From Our Expert
FAQs
Homogeneous vinyl is a resilient flooring where colour and composition run through the entire thickness of the sheet, rather than being printed or layered on top, so the surface stays consistent even as it wears.
It’s installed as a fully bonded system: the subfloor is prepared and primed, a self-levelling screed is applied where needed, the sheet or tile is bonded down with adhesive, then rolled to remove trapped air. Seams are closed last, by hot-air welding.